Welcome to visit en.jzssc8.com!

Hotline: +86-539-4899789

+86-539-4899789  

Service Hotline:

Sales one:+86-539-4271399        Fax:+86-539-4835288

Sales two:+86-539-8608597        Fax:+86-539-8608597

E-mail:sdjlzj@qq.com

Add:Economic development zone Mengyin, Shandong Province。 China

WeChat

Shandong Julong Hydraulic Machine Co。,Ltd。

返回顶部代码

Mobile website

Copyright © Shandong Julong Hydraulic Machine Co.,Ltd. All Rights Reserved                                           

  • banner1
  • banner2
  • banner3

NEWS CENTER

>
>
Dug well positioning folk common sense

Dug well positioning folk common sense

[Abstract]:
  1, cracks in the rock roof, more than halfway up the waist   2, rock formation as the table, water is not too much   3, rock slope slope, slope water more   4, cistern rock water storage, water-rich
  1, cracks in the rock roof, more than halfway up the waist
  2, rock formation as the table, water is not too much
  3, rock slope slope, slope water more
  4, cistern rock water storage, water-rich easy to find
  5, soft and hard phase, water is not difficult
  6, two mountain folder a ditch, ditch water
  7, plus a ditch two mountains, ditch water
  8, a single lithological rock changes, low-lying formations can be wells
  9, limestone class is cut, fissure water flow is blocked
  10, half a circle of landslide, water in it
  11, fault broken zone, easy to mine water
  12, the mountain turned, there is a big flow
  13, weathered layer is covered, the middle of easy water mining
  14, rock fold like waves turn, squeeze often broken spring
  15, looking for karst limestone, far away from a good well
  16, a sudden slow rock dip, cracks find water is not difficult
极速时时彩 北京快乐8 秒速时时彩注册网址 北京两步彩 秒速时时彩 秒速时时彩玩法 福建11选5开奖 秒速时时彩 可靠的网投平台 山东群英会直播